Install yacht mast storage racks to existing sea wall and erect fencing to east boundary of the East Breakwater.
-No.6 Berth- East Arm Walkway St. Peter Port Guernsey GY1 2LL
Official description
Install yacht mast storage racks to existing sea wall and erect fencing to east boundary of the East Breakwater.
- Council
- Guernsey
- Reference
- FULL/2026/0995
- Application type
- Ordinary Application
- Status
- Notification Of Grant Of Full Planning Permission.
- Decision
- Permitted
- Submitted
- 20 Jul 2026
- Decision date
- 8 Sep 2026
- Postcode
- GY1 2LL
More applications in Guernsey
Demolish existing outbuilding, erect ancillary domestic outbuilding and sauna, reposition existing shed and install raised terrace and hardstanding to south-west boundary.
Install electric substation to south boundary.
Extend and alter at ground floor level to create link extension to south-west (rear) elevation.
Remove conservatory/extension to west (rear) of property.
Erect single storey extension and replace window to north (rear) elevation, install replacement windows to south (front) elevation and internal alterations (Protected Building).
Change of use of building from Storage and Distribution (Use Class 22) to motor vehicle repair workshop (Use Class 24).