Outline planning permission with all matters reserved, for the demolition of buildings and mixed-use redevelopment up to a maximum of…
Greenwich Peninsula Masterplan and Plots 18.02 & 18.03, London, SE10
Official description
Outline planning permission with all matters reserved, for the demolition of buildings and mixed-use redevelopment up to a maximum of 737,100sqm comprising:up to 533,900sqm of residential development which could include:i up to 5,813 residential dwellingsii up to 25,000sqm student accommodation (up to 500 rooms) and/or co-living unitsup to 19,600sqm Class A1-A5 use (food and non-food retail, restaurants, bars and cafes); up to 68,700sqm Class B1 (a) (b) (c) (business); up to 24,200sqm Class C1 (hotel) for up to 350 rooms; up to 13,200 sqm Class D comprising D2 (Sport and Recreation), Class D1 (health care facilities/nursery/creche); up to 4,200sqm D1 (education facilities) up to 8,000sqm Theatre (Class Sui Generis); residential and non-residential car parking, as well as a minimum of 2000 AEG parking spaces (for the O2), cycle parking; associated community facilities; public realm and open space; hard and soft landscaping; a new transport hub and associated facilities; realignment of the cultural route traversing the site (The Tide); highway and transport works and associated ancillary works (proposals to revise part of the approved Greenwich Peninsula 2015 Masterplan (15/0716/O). Uplift of 1,757 residential dwellings from the 2015 Masterplan).ÿAnd detailed planning permission, for a residential development comprising 476 residential units, up to 100sqm (GEA) A1/A2/A3/B1/D1/D2 floorspace plus ancillary car parking, access, landscaping and public realm works and associated infrastructure works.ÿThis application is an EIA development and is accompanied by an Environmental Statement.ÿ(Re-consultation due to amended description and updated and additional documents including an updated Environmental Statement Non-Technical Summary, Environmental Statement Review: GPM Response Report June 2020, updated Chapter 10 Daylight, Sunlight and Overshadowing, Supplementary Technical Note Daylight, Sunlight and Overshadowing (July 2020), Updated Chapter 12 Cumulative Effects, Updated Environmental Statement Volume III Townscape and Visual Impact Assessment, Environmental Statement Volume 3 - Part B: Built Heritage (Addendum) and an Environmental Statement of Conformity which provide further information to the Environmental Statement referred to above as well as updated drawings and additional and updated information submitted with the planning application.)
- Council
- Greenwich
- Reference
- 19/2733/O
- Application type
- All Other
- Status
- Commenced
- Decision
- Approved
- Submitted
- 6 Sep 2019
- Decision date
- 1 Sep 2022
More applications in Greenwich
Construction of a 2-storey side extension.
Submission of details pursuant to the discharge of Condition 17 (Recruitment Plans) of planning permission 15/2152/F, dated 23/09/2015.
Lawful development certificate is sought for the construction of a dormer roof extension with outrigger and installation of two rooflights to front roof slope.
Submission of details pursuant to the discharge of condition 3 (Under Floor Heating System) and condition 4 (Method Statement) of listed building consent dated 11/04/2019…
Certificate of lawfulness (Existing) is sought for the alteration to the position of a side door, alteration to roof of rear link building and installation of two air transfer…
Submission of details pursuant to the discharge of Conditions 3 (Contamination Risk Remediation Strategy) and 6 (Piling) of planning permission dated 09/01/2019 (Reference:…