Application to discharge requirement 3 – Written scheme setting out all stages of the authorised development (SW 3 C) by National Grid…
Waltham Cross to Tottenham Substation, near to Highbridge Street, Waltham Abbey
Official description
Application to discharge requirement 3 – Written scheme setting out all stages of the authorised development (SW 3 C) by National Grid Electricity Transmission plc for an Order Granting Development Consent for the North London Reinforcement Project for the uprating of an existing 275kV transmission line of approximately 14km in length from Waltham Cross substation to Tottenham substation to enable it to run at a voltage of 400kV, together with associated development (Revised application to EPF/2072/25, EPF/0226/25 & EPF/0277/26).
- Council
- Epping Forest
- Reference
- EPF/1887/26
- Application type
- Approval Of Details Reserved By A Condition
- Status
- Under Consultation
- Submitted
- 8 Oct 2026
More applications in Epping Forest
Proposed new main roof, incorporating a new loft conversion with a flat roof dormer, finished with black aluminium cladding panels with a Juliet balcony.
Proposed Basement to a semi-detached dwelling in addition to a previous approval for a Two Storey Front and Rear Extension (Ref: EPF/0795/25).
A legal certificate is sought for a coach house extension, alterations and an outbuilding completed over four years ago.
Non-Material Amendment of EPF/1944/24 (Proposed new access to highway to provide additional off street parking including gate and landscaping works).
Certificate of Lawful Development for proposed loft conversion with rear dormer and front roof lights.
Certificate of existing use for two storey extension to Building A, Little Laver Hall, as shown on the Block Plan for residential use.