Phase 1 Essential Repair And Remedial Works To Make Building Wind And Water Tight. Works To Include Roof Works; Stonework; Downtaking And…
Greenfield House Tullibody Road Alloa Clackmannanshire
Official description
Phase 1 Essential Repair And Remedial Works To Make Building Wind And Water Tight. Works To Include Roof Works; Stonework; Downtaking And Rebuilding Of Defective Walling; Temporary Removal Of Some Windows, Internal Joinery And Cornicing To Allow Treatment Of Damp And Rot; Replacement Rainwater Goods Where Required
- Council
- Clackmannanshire
- Reference
- 26/00078/LIST
- Application type
- Listed Building Application
- Status
- Decided
- Decision
- Permitted
- Submitted
- 30 Apr 2026
- Decision date
- 9 Jul 2026
More applications in Clackmannanshire
Habitat Enhancement Works At RSPB Black Devon Wetlands
Installation Of 6 No. Solar Photovoltaic Panels On The Front Roof Slope Of Flat (Retrospective)
Installation of Air Source Heat Pump (ASHP) to Side of House
Installation of Air Source Heat Pump (ASHP) to Side of House
Extension to and Alterations at Garage to Form En-suite Bedroom, Utility and Store
Demolition Of Existing Sunroom And Single Storey Extension To Rear Of House