Install artwork where the landscaped space meets the walls of St Ethelburga's Centre of Reconciliation and Peace.
Office Levels 1 To 7, 100, Bishopsgate, EC2N 4AA
Trades this could involve
Official description
Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.
- Council
- London
- Reference
- 26/01109/FULL
- Application type
- Full Planning Permission
- Status
- Approved
- Decision
- Approved
- Submitted
- 3 Aug 2026
- Decision date
- 22 Oct 2026
- Postcode
- EC2N 4AA
More applications in London
Submitting cycling, delivery and servicing plans, with no building work proposed.
Ground level plans are being submitted for an already approved development; no new building work is described.
Drainage requirements for an existing permission are being reworded, with no physical changes described.
Change when an existing planning condition must be met, with no building work proposed.
Raising the roof terrace safety barrier from 1.2 metres to 1.8 metres.
Details of student accommodation, servicing, lifts, ventilation, bin storage, cycle parking and air quality are being submitted for an approved development.