Submit electric vehicle charging provision and infrastructure strategy details for part of an approved development, rather than propose new installation works.
Land North Of Cherry Hinton Coldhams Lane Cambridge Cambridgeshire
Official description
Submission of details required by condition 55 (Site Wide Electric Vehicle (EV) Charge Point Provision and Infrastructure Scheme Strategy Delivery - partial discharge RMA3 Phase 5) of planning permission 22/01966/S73
- Council
- Cambridge
- Reference
- 22/01966/COND55A
- Submitted
- 28 Oct 2026
More applications in Cambridge
Single storey side extension to include new side access gate
Change of use of existing dwelling (Class C3) to mixed use with residential dwelling and cardiology clinic (Sui Generis).
T1 Sycamore Crown reduce by 4 metres (Previous pruning points)
Single storey front extensions, replacement garage. 17No photovoltaics for South and East roof elevations and installation of air source heat pump.
New detached bungalow with parking for a single vehicle and new footpath crossover.
Replace 24no existing timber frame windows with new Aluclad windows.