EIA Scoping Opinion: The proposed Development is to construct and operate a wind farm of up to eight turbines (with a maximum blade tip…
Glanllynfi Garth Wind Farm Land To The East Of Maesteg
Official description
EIA Scoping Opinion: The proposed Development is to construct and operate a wind farm of up to eight turbines (with a maximum blade tip height of 180m) and associated infrastructure including access tracks and substation
- Council
- Brecon Beacons
- Reference
- 26/24714/SCO
- Application type
- Eia Scoping Opinion
- Status
- Awaiting Decision
- Submitted
- 18 Jun 2026
More applications in Brecon Beacons
Conversion of the existing first floor of the Tannery Building from use class D1 to C2 as a residential institution for the medical training of students at the practice only…
Full planning permission for an extension to Talgarth Bowls Pavilion, including disabled access improvements.
Steel portal frame outbuilding for fodder storage
Certificate of Lawfulness for the continued residential occupation of Cwm Farm without compliance with the agricultural occupancy restriction imposed by Condition 2 of planning…
Conversion of ancillary adjacent storage outbuilding to provide additional habitable accommodation to dwelling house
Proposed installation of solar panels on the interior roof slopes. LBC element to be considered under Faculty Jurisdiction Measure