A final Construction Environmental Management Plan (CEMP) to discharge condition 10 of previous approval LA06/2021/0061/F: A final…
Lands to West of Nos. 110 & 110A-110D Movilla Road; North of Nos. 6-10 (evens) Cloverhill Park Nos 1 3 & 10 Cloverhill Crescent Nos 5 7 & 8 Deanswood Crescent Nos 12-26 (evens) Edenvale Crescent Nos 58 & 87 Stratheden Heights Nos 7 8 10 & 12 Kensington Park & Nos 2 2A & 4 Earlswood Drive; East of Nos 15-27 (odds) Cronstown Cottage Avenue; South of No 8 Cronstown Lane & North of Phase Two of "Rivenwood" Newtownards
Official description
A final Construction Environmental Management Plan (CEMP) to discharge condition 10 of previous approval LA06/2021/0061/F: A final Construction Environmental Management Plan (CEMP) shall be submitted to and agreed by the Council prior to any development activity including ground preparation or vegetation clearance. The final CEMP must identify the perceived risks to the aquatic environment, potential pollution pathways and mitigation measures to negate such risks. The final CEMP must, as a minimum, include the mitigation measures included within the outline CEMP as well as: a) Construction Method Statement(s) - including details of construction and excavation and timing of works; b) Pollution Prevention Plan – including details of a suitable buffer of 10m between the location all construction works, refuelling, storage of excavated spoil/oil/fuel/substrate/construction materials/machinery, concrete mixing and washing areas and any watercourses or any surface drains present on or adjacent to the site. c) Site Drainage Plan; including details of Sustainable Drainage Systems (SuDS), foul waste disposal, surface water disposal/treatment and silt management measures; d) Spoil Management Plan; including location of spoil storage areas outwith the 10m buffer zone, management and handling of spoil and details of the reinstatement of excavated spoil; e) Environmental Emergency Plan; including details of emergency spill procedures and regular inspections of machinery onsite; f) Water Quality Monitoring Plan; g) Details of mitigation measures to protect badgers; h) Details of the appointment of an Ecological Clerk of Works and their roles and responsibilities. The final approved CEMP shall be fully implemented and adhered to during the construction phase to the reasonable satisfaction of the Council. Reason: To ensure effective avoidance and mitigation measures have been planned for the protection of the water environment and designated sites.
- Council
- Ards and North Down
- Reference
- LA06/2026/0609/DC
- Application type
- Discharge Of Condition
- Status
- Consultation Open
- Submitted
- 22 Jul 2026
More applications in Ards and North Down
Non-material changes to LA06/2023/1959/F: reducing gross floor area of the approved Culture Hub, at Ulster Folk and Transport Museum, with minor changes proposed to the window and…
Discharge of Condition 15 of previously approved application LA06/2025/0278/F which states - A programme of post-excavation analysis, preparation of an archaeological report…
Single storey rear extension
Single-storey rear extension
FIrst-floor extension to side.
2 no. illuminated shop signs on front and side elevation